Accessories turnstiles / swing doors

Gotschlich's accessories for turnstiles and swing doors enable structured and standard-compliant access control in electrostatically protected areas (EPA) in electronics production. The product group includes platforms, railings and lane dividers that are used for the orderly guidance and separation of grounded personnel in order to minimize electrostatic loads when entering the EPA.

The accessories can be flexibly integrated into existing EPA access control systems and support compliance with ESD protection measures through controlled personnel access restriction.

 

 

The image shows a low, curved metal barrier. It has two horizontal bars and is securely anchored at both ends. It appears simple and functional.
Lane divider "IKARUS HOLM"
Height: 1000mm, external width: 900mm


Divided with a horizontal bar, fitting with floor flange, screw connection covered with rosette. Material: iameterm 40 mm, V2A surface brushe
d MADE IN EUROPE

Product No.: 6ISP.2SIH10
Price on request
The image shows a white elevator cabin with a large black base. On the left side, there is a railing attached to the cabin. The design is modern and functional.
Platform COMPACT
Dimensions:1100 x 885 x 44 mm
Hot-dip galvanized version, without handrail
covered with rubber mat
prepared for installation of turnstile COMPACT,
handrails (Art. 21565) and locking mechanism Art. 21567)
MADE IN EUROPE

Product No.: 21553-N
Price on request
Image
Installation fee for 1 turnstile or swing door
in Germany and BeNeLux
incl. small fastening material
incl. 1x arrival and departure
Installation on foundations built by the customer according to our specifications, as well as the clamping of the various cables laid by the customer. Empty pipes are to be erected on site. The grid connection including the equipotential bonding
is from an officially conc. electrician. For the handover of the system, a briefing of the
maintenance and operating personnel.

ATTENTION: THE FLAT-RATE COSTS CAN ONLY BE USED FOR
APPLY IF THE ON-SITE PRELIMINARY WORK HAS BEEN CARRIED OUT BEFORE THE START OF ASSEMBLY.

Expenses incurred as a result of delays on site must be offset as director's expenses. DRILLING in various natural and natural
Artificial stone floors must be replaced if necessary. Are carried out with DIAMOND CUTTING TOOLS, they are carried out separately according to ́SERVICES / DRILLING ́
deducted.

Product No.: 70007-1
Price on request
1 to 3 (from a total of 3)